一个神经算子实现低推力地月转移推力中断后的再规划,支持原定或延后到达
One Neural Operator for Re-planning Low-Thrust Cislunar Transfers after Thrust Outages, at the Original or a Later Arrival
研究训练了一个神经算子,将含中断剖面的标称轨迹映射为再规划轨迹及恢复可行性概率,覆盖270次低推力NRHO至DRO转移,允许最多10天到达滑移。在未见转移且零滑移时,严重中断半数场景的中位控制误差为1.20%,最优低成本再规划基准为14.0%;引入到达滑移后误差1.67%对23.2%。该算子对给定滑移的可恢复性预测AUC达0.997,单次查询仅需毫秒且无需调用求解器。
arXiv:2611.33188v1 Announce Type: cross Abstract: Safe-mode events causing thrust outages are common in missions with electric propulsion. To demonstrate mission feasibility in such an event, missed-thrust margin studies are performed where thousands of outage scenarios need an exact re-plan solved. We train a neural operator that maps a nominal trajectory with an outage profile to a re-planned trajectory and to the probability that the recovery exists, for 270 low-thrust near-rectilinear halo orbit (NRHO) to distant retrograde orbit (DRO) transfers, at an allowed slip of up to 10 days. On unseen transfers and zero slip, its median control error on the severe half of outages is 1.20% compared to 14.0% for the best cheap re-planner benchmark. With the arrival slip as an input, the error is 1.67% against 23.2%. It also predicts the recoverability of an outage for a given arrival slip with an area under the receiver operating characteristic curve (AUC) of 0.997, while the minimum recoverable slip prediction is optimistic by more than half a day on only 6 of the 84 checked outages needing slip. At the original arrival, the ensemble spread of an operator variant with solver inputs has a rank correlation of 0.91 with the actual error, and performing exact solves on the 31% most uncertain severe outages reduces the 90th-percentile error from 8.5% to 2.3%. A query takes milliseconds without a solver, making this a useful tool for large outage studies where the cost of thousands of exact solves outweighs the time to train the operator.
来源:arXiv (AI + Vision + Imaging) · arxiv.org