AKR:面向月球机器人任务的安全约束应急规划方法
Trustworthy agentic lunar robotics: safety-constrained contingent planning with a foundation-model planner
研究提出非对称知识级重规划(AKR),将基础模型规划器视为不可信黑盒,可逆动作按规划器假设执行,不可逆动作须经最小成本感知覆盖验证全部前置条件后才执行。在21000次蒙特卡洛试验和58次全栈运行中,AKR未执行任何危险动作,而FF-Replan动作规则在7%的试验中执行了危险动作。AKR在21次应急与顺序故障运行中完成20次,原PLEXIL与EUROPA→PLEXIL流程均未完成。
arXiv:2611.30179v1 Announce Type: new Abstract: Sustained lunar-base operations require robots that restore equipment and deliver cargo under conditions unforeseen before deployment. Flown space autonomy executes pre-validated procedures and enters a safe hold outside their scope, whereas foundation models synthesize plans on site that cannot be verified before execution. We formulate these operations as safety-constrained contingent planning with irreversible actions, erroneous records, three-valued physical evidence, and costly, deadline-constrained sensing. We propose asymmetric knowledge-level replanning (AKR), which treats the planner as an untrusted black box: reversible actions run on the planner's assumptions, and irreversible actions run only after a minimum-cost sensing cover verifies every precondition. Under sound measurements, no irreversible action executes on a false precondition for any planner or record, the sensing cost before an irreversible action is bounded below for every sound knowledge-based policy, and execution with a complete planner ends in a verified goal or a certified hold. AKR executed no hazardous action in 21,000 Monte Carlo trials with sound observations or in 58 full-stack runs; the FF-Replan acting rule executed one in 7% of those trials. The median AKR run took 1.10 times the fastest run on the same mission, against 1.50 under the K-replanner acting rule. AKR completed 20 of 21 contingency and sequential-fault runs with an unchanged task model; the original PLEXIL and EUROPA$\rightarrow$PLEXIL procedures completed none.
来源:arXiv (Robotics + Hardware + Signal) · arxiv.org